Shape the Future of I-35

    Project Vicinity Map

    “The I-35 Capital Express Central project proposes to add two non-tolled managed lanes in each direction along I-35 from US 290 East to SH 71/Ben White Boulevard. Managed lanes are proposed in high-congestion areas where right of way is limited. These lanes are designed to provide a less congested route than adjacent general-purpose lanes during peak periods for qualifying vehicles. Managed lanes control access by placing restrictions on use. TxDOT is evaluating a variety of design options to add the non-tolled managed lanes. The project also includes additional safety and mobility improvements.”

    Learn more about the project here.

    Have feedback on this project? We’d love to hear it. Contact the ECC.

    Categories: General