Author: Kristen H
-
Shape the Future of I-35
“The I-35 Capital Express Central project proposes to add two non-tolled managed lanes in each direction along I-35 from US 290 East to SH 71/Ben White Boulevard. Managed lanes are proposed in high-congestion areas where right of way is limited. These lanes are designed to provide a less congested route than adjacent general-purpose lanes during…